Prepare for the NCEES Fundamentals of Engineering (FE) Civil Exam with multiple choice questions, hints, and detailed explanations. Maximize your study efficiency and ace your exam!

Loose-measure refers to the volume of material, particularly soil or aggregate, in its unconfined state prior to any compaction. This term captures the volume of material as it exists directly after excavation and before it is subjected to any compaction processes, which typically occur during construction or when being transported. In this phase, the material is loosely arranged, and the void spaces between the particles are maximized.

When considering the context of civil engineering and site preparation, understanding loose-measure is crucial for calculations related to material quantities. It helps engineers estimate how much material will be needed for projects, as the volume can change significantly once the material is compacted or influenced by other forces.

Options that mention the volume after compaction, the volume in its natural state, or the volume of earth in an embankment do not accurately represent the definition of loose-measure, as they refer to different conditions of the material where compaction or specific placement occurs.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy